How about Changsha Yisheng Heating? Popular topics on the Internet in the past 10 days and real feedback from users
Recently, as the winter heating season approaches, the service quality of Changsha Yisheng Heating has become a hot topic among local residents. Combined with hot discussions and data feedback from the entire network in the past 10 days, this article will analyze the real situation of Changsha Yisheng Heating from multiple dimensions such as price, service, and user reviews.
1. Hot topics related to heating in the past 10 days across the Internet

| Ranking | Topic keywords | heat index | Main discussion platform |
|---|---|---|---|
| 1 | Changsha winter heating price | 85,200 | Weibo, Xiaohongshu |
| 2 | Yisheng heating complaints | 62,300 | Zhihu, Tieba |
| 3 | Floor heating installation comparison | 53,100 | Douyin, Bilibili |
| 4 | Heating equipment repair | 47,800 | local forum |
2. Comparison of core data of Changsha Yisheng Heating
| Project | Yisheng Heating | Industry average |
|---|---|---|
| Basic installation fee (100㎡) | 18,000-22,000 yuan | 16,000-20,000 yuan |
| Monthly usage fee (100㎡) | 800-1,200 yuan | 700-1,000 yuan |
| 24-hour after-sales response rate | 78% | 85% |
| Equipment warranty period | 2 years | 3 years |
3. Analysis of real user evaluations
Based on 327 valid reviews collected in the past 10 days, user feedback shows the following characteristics:
| Review type | Proportion | Typical comments |
|---|---|---|
| Installation professionalism | 68% positive | "The master is very professional and the pipeline layout is reasonable" |
| cost transparency | 42% negative reviews | "There were inexplicably more material surcharges later on" |
| Heating effect | 75% positive | "The room temperature is stable at around 22℃" |
| After-sales service | 53% rated it favorably | "We only came to your door 48 hours after reporting for repair" |
4. Consumers’ key concerns
1.Price dispute:Many users reported that the actual cost was 15%-20% higher than the contract quotation, mainly due to the addition of hidden projects.
2.After-sales time:A user in Yuhua District complained that the wait for repairs exceeded 72 hours during the winter peak period, affecting normal use.
3.Energy saving performance:Some users shared measured data, showing that the monthly energy consumption of residential buildings with the same area is 8%-12% higher than that of competitors.
5. Professional advice
1. When signing a contract, be sure to specify the "closed contract" clause and specify all possible costs.
2. Give priority to service providers equipped with original after-sales teams. The response speed of third-party outsourcing services is generally slow.
3. It is recommended to complete equipment maintenance before November to avoid the peak maintenance period of the heating season.
Summary:Changsha Yisheng Heating has gained more recognition at the professional and technical level, but it still needs improvement in terms of cost transparency and service response speed. When consumers choose, they should make a trade-off based on their own priorities of price sensitivity and service requirements.
check the details
check the details